Showing posts with label 3D ME Modelling. Show all posts
Showing posts with label 3D ME Modelling. Show all posts

Monday, October 20, 2014

As-Built Construction Assets: Key to Future Planning and Facilities Management



Preparing ‘as-built’ drawings and models is certainly one of the most crucial requirements of any design-build project. These final set of construction assets validates how the contractor built the structure including all the changes and modifications that were made in the process. The finalised drawings and models are passed on from the contractors to the building owners and property managers.

The set of as-built drawings and models, though underestimated and neglected, broadly serve a dual purpose. Firstly, the as-built drawings and models act as a guidebook to the AEC (architecture, engineering, and construction) firms that are contracted for renovation and refurbishment of an existing structure. So, the time, cost, and resources that would have been utilised during pre-renovation survey are saved. Secondly, they help owners and facilities managers to conveniently undertake maintenance and refurbishment activities besides helping them during emergency situations e.g. for rapid evacuation.

Whereas data-rich as-built 3D building information models have obvious benefits over 2D drawing sets, the decision to choose one over the other mainly involves factors, such as the scale of the project, owner’s preference, and the design-build teaming structure. The owners of relatively small building projects may prefer 2D as-built drawings of an existing building, prepared by a technician after collecting accurate data on site. On the contrary, large-scale design-build and renovation projects may require BIM-driven as-built 3D models.

Assuming that the project in question has not had a BIM model for the design process which is then updated during the as-built stage of the project, there are two typical ways of preparing as-built BIM models. Firstly, using the as-built drawings and other construction drawing sets as the starting point, 3D BIM models can be prepared using applications such as Autodesk Revit. The second method involves the Scan to BIM technique where   point cloud data of the structures. This point cloud data is then converted into an intelligent BIM model using tools such as Cloudworx and Scan to BIM applications such as Revit.

The as-built drawings and BIM models serve as a comprehensive reference tool for owners and property managers. They benefit from these as-built drawings and models in the following ways:-

·     The finalised as-built construction assets make future project planning, including renovations, extensions, and redevelopments, convenient and cost effective for the owners.

·     Since the as-built drawings and BIM models contain complete details related to dimensions, fabrication, erection, elevations, sizing, materials, location, and mechanical/electrical/plumbing utilities, the owners can use this data and conveniently manage facilities within budget.

·     The owners can use these as-built assets to resolve disputes regarding insurance claims. In case of a massive loss due to extreme disasters, the insurance company will require extensive documentation, including the as-built drawings and models to support your claims.

As the as-built drawings and models are prepared by combining the drawings/models of all the building services, the owners and property managers can schedule maintenance operations of the building’s MEP (M&E) systems in a timely manner.

Wednesday, March 12, 2014

CAD and BIM Outsourcing: A Positive Value Proposition to Gain A Competitive Edge

Construction and design documentation form an integral element of any construction project's design and planning stage. With the clients (facility owners) raising benchmarks with regards to quality, cost efficiency and completion timeframes for such projects, the entire AEC fraternity is seeking ways to meet these requirements, whilst staying profitable. In addition to this, there is a growing client-side demand for employing BIM-based 3D virtual planning in combination with traditional 2D CAD methods for multi-faceted benefits. Accordingly, architectural and building services firms are considering CAD and BIM outsourcing as a suitable practice not only to reduce cost but also increase quality, productivity and boost in-house efficiency.
Whether the project requirements include elementary paper-to-CAD conversions or complex MEP modelling and coordination support assignments, there are numerous benefits that architectural, MEP engineering, contracting, project management and MEP consulting firms can derive from outsourcing their construction design and documentation work. Some of them include:

1. Cost-Effective Access to CAD and BIM Expertise

It is extremely difficult for architectural and MEP firms to set up specialised internal teams proficient in developing BIM-based design and construction drawing sets. Transitioning from 2D CAD to BIM is a long learning curve, particularly for small- and medium-sized practises. For such firms, partnering with a third-party vendor who specialises in outsourced CAD services can speed up turnaround times whilst maintaining quality standards and local design regulations.

2. Ability to Concentrate on Core Function

When firms involved in architectural, building services, general contracting, project management and AEC consulting, outsource their CAD and BIM documentation work, they can conveniently reduce operating costs whilst focussing on their respective fundamental services.

3. Support to Share Project Risk

Having a competent and reputed CAD outsourcing partner allows a business to share the project risk. When you subcontract design and construction drawing assignments to a third party, you trim down the risk involved in training your internal team members and having them execute a non-core function. Furthermore, in the AEC industry wherein timelines and quality standards are critical to success, outsourcing can prove to be a valuable route to a business' success.

4. Time and Resources to Develop Internal Team

Outsourcing saves the time, effort, and cost involved in setting up CAD teams, including procuring software licenses, configuring high-tech systems and putting together a team of expert technicians. As a result, the firms that outsource efficiently use the same time and effort to develop their in-house team.

5. Leverage Time-Zone Advantage

By choosing to offload CAD and BIM-driven documentation work, including drafting, 3D modelling, 4D scheduling, MEP drafting, MEP modelling, MEP coordination and clash detection, architectural and MEP engineering firms can easily make full use of the difference in time zones. For instance, if a UK-based architectural practise outsources its design and documentation work to an Indian-based CAD company, your assignment will be worked upon whilst you are away from office and delivered when you return the next morning. As a result, you get round-the-clock operations for your business that will increase productivity.

6. Save on Recruitment Overheads

Offloading CAD and other complex BIM-based design documentation services to third-party providers offers a business the ability to remain flexible and quickly adapt to market fluctuations as the cost, time and efforts of recruiting, training and setting up a quality team of technicians are saved.

7. Enhance End Deliverables

When non-core functions are subcontracted to outsourcing providers, the entire delivery life-cycle shortens whilst maintaining quality benchmarks agreed upon. Since your outsourcing partner can deliver high-quality documentation sets faster, your business can boost up input-to-output time cost-effectively. As a result, you maintain the quality and timeliness of your service, thereby increasing the end client's satisfaction.

8. Trim Operating Costs

Establishing a highly-skilled team of CAD and BIM technicians involves recruitment, employee training, procuring software licenses, besides setting up the hardware and online collaboration infrastructure. When your business chooses CAD and BIM outsourcing as an option, you can cut back on the outlay, time, and efforts required for the same.

9. Provide Competitive Edge

As there is a greater push than ever by all the key stakeholders to avoid budget overruns during all phases of the design and build, outsourced CAD services can certainly prove to be a positive value proposition for architects, MEP (M&E) consulting firms, and general contractors looking for a scalable yet cost-effective alternative to setting up in-house teams. This, in effect, provides a highly competitive edge whilst offering a flexibility to tackle the ups and downs of market cycles.
Kuldeep Bwail is a Director at XS CAD Limited, one of the leading Revit 3D BIM Modeling companies providing outsourced CAD services to architects, engineers, MEP (M&E) consultants and contractors across the UK, US, Australia, Canada, Europe, India and the Middle East.

Monday, December 16, 2013

3D Building Information Modeling Facilitates Accurate Cost Estimation to Avoid Budget Overruns

As the property owners increasingly demand timely and in-budget completion of projects, all the key stakeholders are increasingly adopting 3D BIM Modeling to achieve the same. Whilst the traditional design-bid-build project delivery methods are still significantly used by the AEC industry, the AEC firms employing the same methods increasingly run the risk of cost overruns. Furthermore, the risk factor escalates as the complexity and scale of the build project increases. Since the core team consists of professionals from highly diverse trades, the collaborative BIM workflows, when used within the design-build and integrated project delivery (IPD) frameworks, help avoid drastic cost overruns.

One of the key advantages of BIM modeling over non-BIM 3D modeling and 2D CAD techniques is that the former facilitates rapid and accurate cost estimation during all phases from design through to construction. The ability of 3D BIM models to generate accurate quantity and material takeoffs play a crucial role in enabling better decision-making with respect to project modifications whilst reducing costly budget overruns. Whereas accurate cost estimation is critical during the planning and conceptual stage to seek the owner’s approval, it is equally decisive during the construction stage to keep the entire team in the know of the implications of their design modifications.

The cost estimates derived from conceptual BIM designs ensure feasible decisions are made early on in the design and planning process, which in turn, govern the eventual project cost. As a result, such a valuable cost feedback in the initial stages of the project helps build a strong foundation for the latter stages of the project. Moreover, since the combination of 3D BIM workflow and IPD brings together all the multidisciplinary professionals during the pre-construction phase, such precise cost estimations keeps all the major stakeholders well informed about the financial implications of their decisions. More importantly, this risk and reward-sharing framework facilitates smooth information-sharing and better decision-making so as to keep the project on-track and within budget.

In order to realize the benefits of cost estimation during the design phase, it is critical to integrate the BIM models with an external database which contains costing information relating to quantity takeoffs. Compared to the traditional method of cost estimation, BIM-led cost feedback improves accuracy, offers time savings, and increases the speed of estimation. Whilst setting up BIM-based cost estimating the workflow requires planning, its benefits overshadow the time and effort required to do so.

On the whole, detailed quantity takeoffs resulting from BIM models help key decision makers to consider several what-if scenarios and compare the cost impact of each alternative during all phases of the design and construction. These detailed cost estimates also enable key project stakeholders to assess the deviation in cost from the the planned budget at every stage and make all necessary corrections. Accordingly, BIM-driven cost estimation ensures the entire team can share budget-related inputs, perform cost-benefit analysis of multiple design options collaboratively, and most importantly, curb costly, time-consuming design conflicts and rework.

Monday, July 4, 2011

3D M&E (MEP) Coordination


“Our core skill and main activity for M&E (MEP) Contractors and Designers is the provision of spatially coordinated building services drawings for M&E Consulting Engineers and M&E Building Services Contractors for construction and engineering projects” 



M&E Coordination work involves coordination of all building services (HVAC, Pipework, Public Health and Electrical) with other disciplines making up the building structure, fabric and external envelope (steel, concrete, false ceilings etc).

All of our M&E Co-ordination/Multi-Service Coordination work is created in a 3D environment for all disciplines. By creating a virtual 3D model we are able to offer many advantages to our clients:

1) It allows us to ensure that there are no clashes (this can be validated easily using clash detection software)
2) It allows us to model and represent all mechanical components/kit accurately (unlike 2D CAD Drawings) and therefore ensures that spatial issues are addressed before getting to site.
3) Prevents site based delays and disputes as all services have already been proven to work within the building.
4) Allows for ease of communication (the 3D model can be viewed and walked through easily for demo, review, value engineering or QC purposes)
5) Faster approval / sign off (compared with 2D drawings alone, the 3D model allows our clients to view detailed areas in a 3D environment)
6) Allows any number of views, sections and detailed drawings to be produced easily and quickly.

The XS CAD team has extensive experience of working in the building services engineering sector with strong contracting backgrounds. This experience is used more effectively now in the CAD Bureau environment where we utilize the latest technology to perform, validate and deliver our coordinated services drawings – providing a 'clash free solution’ as part of our service.

By using the latest 3D M&E modeling software (AutoCAD MEP and Navisworks) and clash detection technology (Autodesk Navisworks) we are able to verify that our spatially coordinated M&E building services models work to engineering standards and constraints as well as the structural and architectural elements within a building.

Our experience includes M&E co-ordination of plant rooms, building risers, pre-fabricated corridor and ceiling modules for healthcare, education, entertainment, commercial and mixed use projects.



Like us on Facebook    http://www.facebook.com/xscad
Follow us on Twitter   http://twitter.com/#!/xscad