Building Information Modeling Services (or BIM Services as they are commonly known) are becoming increasingly significant for modern construction projects. It has revolutionized the construction industry with its ability to make a digital representation of a building project.
Showing posts with label BIM construction. Show all posts
Showing posts with label BIM construction. Show all posts
Wednesday, June 4, 2014
3D Building Information Modeling (BIM) | BIM Modelling
Wednesday, February 5, 2014
3D BIM Modeling: Key is to Interpret Client’s ‘Real’ Needs
The concept of building information
modelling (BIM) has received universal acceptance from the building services,
structural engineering and architectural fraternity mainly due to its need for
lean construction and also its cross-disciplinary usability. 3D
BIM modeling
has existed for a number of years now
and the industry is aggressively adapting itself to embrace the new workflows
of the BIM process; however, there is still a lack of clarity amongst the
owners (the clients) as to what exactly they can achieve from these models,
what they need to achieve and how they can make optimum use of this concept.
![]() |
3D BIM Modeling |
This article seeks to explore some
beliefs related to the use of BIM and sheds light on when it should be used and
to what extent. For the sake of clarity, it is important to know the difference
between non-BIM 3D CAD models and a parametric BIM models.
3D CAD models are virtual
representations of a facility that provide only visual details. Applications
such as AutoCAD Architecture and AutoCAD MEP are used to create 3D CAD models
that can be used for design, development, construction and pre-fabrication. On
the other hand, BIM models are intelligent models embedded with parametric
details that are extremely important for design, development, construction,
pre-fabrication, assembly, analysing energy performance and facility management
of the built environment. For BIM projects, the details can be effectively
shared between different project stakeholders: facility owners, designers/architects,
MEP (M&E) engineers, fabricators, consultants and contractors. Revit
Architecture and Revit MEP are applications used for BIM modelling whilst
Navisworks is employed to detect clashes between different system models.
One of the most crucial aspects that
helps decide whether BIM is actually required or not is gaining an in-depth
understanding of the model’s purpose. More often than not, there is so much difference
between client’s ‘stated’ needs and his/her ‘real’ needs. In a lot of cases, clients state that they require
a BIM model but actually what they require is a smart clash-free 3D model which
can be used to extract respective construction drawings. In such scenarios,
AutoCAD MEP or AutoCAD Architecture could easily be used to provide a 3D model
that meets this need. Alternatively, a BIM software tool could be used to
provide a 3D model without providing additional elements such as data rich
'information'.
In other cases, a BIM model may
actually be the basis to plan, design, construct, and manage a particular
facility. These scenarios require multidisciplinary project stakeholders to
access the BIM model at different stages in the project lifecycle. As a result,
the most important factor that dictates the success of any project employing
BIM is the richness of ‘information’ embedded into the models. So, depending on
the project’s scope, a full-fledged BIM model may contain valuable information,
such as dimensions of building elements, quantity take-off data, material
requirements, time scheduling, costing, prefabrication data, activity
simulation, and energy performance. Other important factors that contribute to
success of BIM include the data-sharing and interoperability standards to allow
smooth multidisciplinary collaboration between key disciplines.
Irrespective of whether the client
actually requires BIM or non-BIM CAD model, the BIM wave that has spread across
the AEC industry has forced the agenda to adopt a more progressive approach to
planning, designing and coordinating models and drawings. The industry
continues to transition from non-BIM 2D approaches to collaborative BIM
workflows and 3D CAD workflows and even that is a huge shift for the industry.
This change is more often than not influenced by the demand side i.e. the
clients.
Nevertheless, the current wave of
change in favour of adopting BIM applications and processes has helped the
entire AEC supply chain embrace intelligent virtual planning and development
techniques for architectural and building services design, spatial coordination
and collaboration.
Kuldeep Bwail is a Director at XS CAD Limited, one of the leading BIM
outsourcing providers offering BIM
Services
to architects, engineers, MEP
(M&E) consultants, and contractors across the UK, US, Australia, Canada,
Europe, India and the Middle East.
Monday, January 13, 2014
BIM Drives Cost-Efficiencies for Plumbing Design
Since our construction industry is
grappled with severe productivity issues and tight margins, the AEC industry is
striving hard to come up with new ways of improving productivity, reducing
construction costs and delivering a better-built building. Building Information
Modeling, a new technological advancement in the AEC industry after CAD seems
to have the potential to address these issues.
As per the definition of BIM by The
National Building Information Model Standard (NBIMS), “BIM is a digital
representation of physical and functional characteristics of a facility and it
serves as a shared knowledge resource for information about a facility forming
a reliable basis for decisions during its life cycle from inception onward”.
BIM has evolved from being just a buzzword to the centrepiece of AEC technology
and it has significant benefits for plumbing design.
BIM enables a 3d virtual representation
of the plumbing systems thus helping to better understand the final outcome,
make more informed decisions and detect collisions. One of the major benefits
BIM technology serves for plumbing is interference-checking. Using BIM to
detect early collisions helps to prevent costly design changes during the
actual construction process whilst also reducing guesswork and errors.
Since the underground plumbing lines are
located in reference to the foundations; BIM enables a plumbing designer with
actual building footings marked by the structural engineer to preserve the
structural integrity of the building. With the help of the building footings, a
plumbing designer can easily coordinate the underground routing without
compromising the structural design of the building.
Building Information Modeling is an
‘information’ rich model. In addition to building shape, costs, design,
construction time, physical performance, costs and logistics, BIM also provides
information about two additional parameters in the case of plumbing fixtures –
information about the required gpm flow of the standard fixture and the reduced
gpm flow.
With an aim to conserve energy and
natural resources, there has been an increased focus on green building
projects. BIM facilitates easier identification of systems in LEED Plumbing
Design by creating different colour systems. Since there is a variation in
colour, identifying grey water routing becomes easier and hence helps to
prevent cross contamination with other waste systems.
BIM creates a unified working
environment with multiple disciplines working together on a single file. A
plumbing engineer can create a design for hot and cold water and simultaneously
check the HVAC design worksheet for conflicts.
BIM serves a plethora of benefits for
plumbing design such as increased efficiency, accuracy and coordination of the
system as well as reducing the time and cost involved in it.
Monday, June 13, 2011
BIM Modelling
Building Information Modelling is becoming increasingly vital for modern construction projects. Not only does it provide a digital representation of a building project, it also allows facilitates greater levels of collaboration and interoperability within the design environment.
Building Information Modelling (or BIM as it is commonly known) covers a range of elements including geometry, graphical information, spatial relationships, product/material information and quantity information. As such the use of a 3d BIM model is not merely restricted to architects or design engineers and is also useful to project management, cost management, manufacturing and construction teams and also the facilities management teams who are the eventual owners of such models.
One of the key differences between modern BIM technology and traditional software is that BIM software is written and developed for the design of buildings and their components. The objects created within BIM models represent actual elements within a construction project and therefore this information becomes more useful to designers, installers and cost consultants.
At XS CAD, we create BIM Models using Autodesk Revit software. Autodesk Revit is a multi-directional, database controlled application which allows changes in one location to be replicated automatically in all other areas where the changed item appears (including layouts, elevations, schedules or the 3d model itself).
By using Autodesk Architecture, Autodesk MEP and Autodesk Structures, we are able to create design data for a single construction project with the same family of software. This level of interoperability provides obvious time and cost benefits but also allows the entire project team to view the impact of their individual designs with those of others and to resolve conflicts based on this knowledge.
As part of our BIM service we are able to maintain all elements of a BIM model within our Integrated Project Delivery approach or provide a BIM service to one party involved in a BIM project but without the expertise for BIM model creation and management.
As part of our BIM Modelling service we also create BIM or family data for Revit Architecture and Revit MEP. This data encompasses physical and graphical elements as well as technical and manufacturer information for the element being modelled. Another key benefit of BIM models are the parametric properties and family properties assigned to models. Parametric modelling allows controlled and dynamic manipulation of models. This allows models to be changed quickly and easily within their range of parameters while also maintaining physical appearance and ‘model information’ within all areas automatically.
Building Information Modelling (or BIM as it is commonly known) covers a range of elements including geometry, graphical information, spatial relationships, product/material information and quantity information. As such the use of a 3d BIM model is not merely restricted to architects or design engineers and is also useful to project management, cost management, manufacturing and construction teams and also the facilities management teams who are the eventual owners of such models.
One of the key differences between modern BIM technology and traditional software is that BIM software is written and developed for the design of buildings and their components. The objects created within BIM models represent actual elements within a construction project and therefore this information becomes more useful to designers, installers and cost consultants.
At XS CAD, we create BIM Models using Autodesk Revit software. Autodesk Revit is a multi-directional, database controlled application which allows changes in one location to be replicated automatically in all other areas where the changed item appears (including layouts, elevations, schedules or the 3d model itself).
By using Autodesk Architecture, Autodesk MEP and Autodesk Structures, we are able to create design data for a single construction project with the same family of software. This level of interoperability provides obvious time and cost benefits but also allows the entire project team to view the impact of their individual designs with those of others and to resolve conflicts based on this knowledge.
As part of our BIM service we are able to maintain all elements of a BIM model within our Integrated Project Delivery approach or provide a BIM service to one party involved in a BIM project but without the expertise for BIM model creation and management.
As part of our BIM Modelling service we also create BIM or family data for Revit Architecture and Revit MEP. This data encompasses physical and graphical elements as well as technical and manufacturer information for the element being modelled. Another key benefit of BIM models are the parametric properties and family properties assigned to models. Parametric modelling allows controlled and dynamic manipulation of models. This allows models to be changed quickly and easily within their range of parameters while also maintaining physical appearance and ‘model information’ within all areas automatically.
Subscribe to:
Posts (Atom)